What the estimate includes
Required volume comes from geometry, thickness and allowance.
Delivered mode multiplies order volume by your price per m³; premix mode multiplies whole bags by bag price.
Site-mixed mode calculates cement, sand, aggregate and water from editable doses, then applies your prices.
Calculation principle
Worked example
If 2.40 m³ are required and delivered concrete costs 150 €/m³, material cost is 360 € before delivery, pumping and labour.
Not included automatically
- Delivery, minimum order, pumping and site access.
- Equipment hire, handling and labour.
- Local price variation and the actual required mix design.
Frequently asked questions
Is a price required to calculate volume?
No. Dimensions provide volume and quantities; prices are a separate optional step.
Is the cheapest mode always best?
No. Work time, mix consistency, access and delivery can dominate for larger volumes.